All posts

Pole barn vs steel · 2 min read

Pole Barn or Metal Building in Snow Country? Start With Your Snow Load

In heavy snow, the building rated for your address wins. Ground vs roof snow load explained, what changes in a steel frame, and what to check on any quote.

By Hightower Steel

Black steel garage in fresh snow surrounded by pine trees

Part of the Steel Buildings vs. Pole Barns

Quick answers

What does a 20 or 30 psf snow load mean?
It means the roof is designed to carry 20 or 30 pounds of snow on every square foot. As a rule of thumb, 10–12 inches of fresh snow, 3–5 inches of old packed snow, or 1 inch of ice each weighs about 5 psf (IBHS). A foot of fresh snow can weigh anywhere from 3 psf (light, dry) to 21 psf (wet, heavy) (FEMA P-957).
Can a roof hold 20 inches of snow?
It depends on the snow, not just the depth. Twenty inches of dry powder is light, while 20 inches of wet, packed snow can exceed a 20 psf design. That's why you buy to your site's design load from the ASCE Hazard Tool, not to a depth in inches.

In snow country, the right building is the one engineered for the snow at your address, whether it's steel or post-frame. We build steel, and we design it to your site's load: tighter leg spacing, more roof steel, heavier gauge and a steeper pitch. The failure we see isn't steel vs wood. It's a building rated for less snow than it gets.

Ground snow load vs roof snow load

  • Ground snow load is the mapped design value for your location, in pounds per square foot. You can look it up with the ASCE Hazard Tool.
  • Roof snow load is what the engineer designs the roof for, calculated from the ground value and adjusted for roof slope, exposure and drifting.

The two aren't the same number. Ask which one a quote is quoting, and which code edition your county enforces; ASCE 7-22 changed the snow maps (Viking Barns explainer). Some states set values by county. Minnesota, for example, assigns 60 psf ground snow load in northern counties and 50 elsewhere (Minnesota Rules 1303.1700, via Sherman).

Tan steel garage with two white doors and a snow-covered roof

What we change in a steel frame for heavy snow

  • Legs closer together.
  • More roof steel: hat-channel spacing tightened.
  • Heavier gauge.
  • Steeper pitch, so snow sheds sooner.

When your load exceeds what the building maker's standard drawings cover, we bring in an engineer for site-specific drawings.

Why we don't build pole barns there

A pole barn has to carry the same code snow load, so neither type gets a pass. Our reasons for steel are the foundation and the wood: posts set about 4 feet in the ground can rot, and green lumber can twist as it dries. A steel building bolts to a slab. More in Metal Building vs Pole Barn.

Slab and frost

Your slab must meet the building's minimum requirements and local code, which may require going below the frost line. Where code allows, a frost barrier with rigid insulation can avoid digging deeper; ask your building office. Pour thick enough for the anchors: 8 inches long, in at least a 12x12-inch concrete perimeter or whatever the drawings specify.

Steel tube frame components on a flatbed trailer in the snow

Check this on any snow-country quote

  1. The ground snow load and roof snow load on the drawings, in psf.
  2. The code edition used.
  3. Leg spacing, hat-channel spacing and gauge.
  4. Drift at any lean-to or roof step.
The full guideSteel Buildings vs. Pole BarnsAn honest comparison of steel buildings and post-frame pole barns for workshops, garages, and ag buildings — including when a pole barn is the better call.

Ready to see your numbers?

Tell us what you're building. Quotes within 24 hours.

Call (833) 387-8335
Call