All posts

Pole barn vs steel · 4 min read

Tube Metal Building vs Pole Barn: Which Should You Build?

Tube metal building or pole barn? Why we almost never recommend a pole barn: rot, twisting wood and foundations, plus easy maintenance and fast installs.

By Hightower Steel

Black steel garage with a dark roll-up door on a gravel pad with fall trees behind
Example building shown. Your size, layout and options may differ.

Part of the Steel Buildings vs. Pole Barns

Quick answers

When is a pole barn the better choice?
Honestly, almost never. Our concerns with pole barns are specific: More
Who is a tube steel building right for?
Anyone who wants the most for their money. Our typical tube steel buyer is on a bit of a budget and wants as much bang for their buck as possible. More
What happens when people switch from a pole barn to steel?
One story stays with us: a customer whose pole barn burned down. When it came time to rebuild, they wanted a steel building. More
Which lasts longer and needs less maintenance?
Maintenance on a metal building is simple. Reapply galvanized spray where it's needed, keep the building clean, and don't scratch the galvanized coating. More

For most people, we recommend the tube metal building. We almost never point someone to a pole barn. Pole barns put 6x6 posts 4 feet into the ground, and that wood rots. The lumber is often cut too fast and not dried long enough, so it keeps drying after the building goes up and twists the structure. A steel building sits on top of a foundation, which is the most important part of the build.

That's the short answer to a question that comes up all the time, including on r/metalbuildings: "Tube metal building vs pole barn?" Here's the longer version.

When is a pole barn the better choice?

Honestly, almost never. Our concerns with pole barns are specific:

  • Posts in the ground rot. The 6x6s go 4 feet into the ground, and wood in the ground rots.
  • Green lumber twists. Wood is often cut too quickly and not dried long enough. When you take delivery it's still drying, and that leads to the building twisting.
  • No real foundation. With a steel building you're sitting on a foundation, and the foundation is the most important part of the building process.
Open steel frame carport with a red roof standing on a grassy lot
Example building shown. Your size, layout and options may differ.

Who is a tube steel building right for?

Anyone who wants the most for their money. Our typical tube steel buyer is on a bit of a budget and wants as much bang for their buck as possible.

Cost is a big part of it. Wood is more expensive than steel these days, and so much of a steel building is prefab that it cuts down on cost.

What happens when people switch from a pole barn to steel?

One story stays with us: a customer whose pole barn burned down. When it came time to rebuild, they wanted a steel building. Steel won't burn down if there's a fire.

Which lasts longer and needs less maintenance?

Maintenance on a metal building is simple. Reapply galvanized spray where it's needed, keep the building clean, and don't scratch the galvanized coating. That's the whole list.

If you later screw into the tube frame, for example to strap the inside or hang something, use self-tapping screws. Then spray galv on the spot, because drilling goes through the protective coating.

Weathered wooden post decaying where it enters the soil next to a metal wall
Example building shown. Your size, layout and options may differ.

How fast does a steel building go up?

Nothing beats how fast these buildings go up. We've had a 50x80 go up in 3 days. Our crews also drill the anchors themselves, so you're not on the hook for that.

The biggest variable in your schedule is you. Lead time doesn't start until your site prep and permit are ready. Order as soon as your design is final, get your drawings, then get the permit and concrete done.

What are the real weak spots of a tube steel project?

The buildings themselves are fine. Where projects go wrong is communication. Lead times aren't explained, and nobody follows up. That's a people problem, not a steel problem. We handle the follow-ups ourselves and keep customers informed so they have a good experience.

Tube steel does have design limits. At its most basic, it's a carport made into a garage, so if you want something very high-end, it may not satisfy you. And you can't hang hoists from a square tube frame or add lofts to one; storage needs to be freestanding.

Pole barnTube steel building
What it sits on6x6 posts set 4 feet into the groundA concrete foundation
Frame materialWood that can rot in the ground or twist as it driesGalvanized steel tube
FireWood burnsSteel won't burn down
UpkeepWatch posts and lumberKeep it clean; touch up galvanized spray where needed
Install speedVariesWe've had a 50x80 go up in 3 days
Adding on laterVariesTake the back end off and add on
Hoists and loftsVaries by designNot from a square tube frame; storage must be freestanding

Can you add on to a steel building later?

Yes, and it happens all the time. With a metal building we just take the back end off and add on.

That's useful, because 90% of people tell us they wish they'd gone bigger. Plan big from the start if you can, but you're not locked in.

Is tube steel strong enough?

These are structurally engineered buildings. They meet the same wind and snow load requirements that a red iron building meets. In high snow load areas we change the leg spacing, add more material in the roof by tightening the hat channel spacing, and use a heavier gauge steel.

The bottom line

A pole barn puts wood in the dirt and hopes it stays straight. A tube steel building sits on a foundation, goes up fast, and needs almost no maintenance. For most people who want a garage or shop that lasts, steel is the better build.

The full guideSteel Buildings vs. Pole BarnsAn honest comparison of steel buildings and post-frame pole barns for workshops, garages, and ag buildings — including when a pole barn is the better call.

Ready to see your numbers?

Tell us what you're building. Quotes within 24 hours.

Call (833) 387-8335
Call