Permits & slabs · 3 min read
Permitting a Metal Garage/Shop in City Limits: What to Expect
Permitting a metal garage in city limits: the city gets more involved, peak height is the usual catch, and you'll need a site plan and stamped drawings.

Part of the Site Prep, Concrete Slab, and Permitting Handbook
Quick answers
- How is permitting different in city limits?
- Find your local permit office and confirm which office handles building permits and which handles zoning for your address. More
- Will the city treat a steel building as "atypical"?
- That isn't something we've run into. We've never had a building department treat our steel buildings that way. More
- What does the city need from you?
- Plan on handing the permit office: More
- Who handles which part of the permit?
- We handle installing the building, and we give you all the information you need to get your permit. You pull the permit yourself. More
Expect the city to want more information and to be more involved in the process than a rural county would be. It's a little more annoying, but if your property is zoned for it, your setbacks are right and you're not in an HOA, you won't have any problems. The limit that catches city customers most is peak height.
A homeowner on r/Seattle asked whether anyone had permitted a metal garage or shop "in Seattle city limits," and was worried about it being treated as "atypical construction." Here's what we tell customers building inside city limits anywhere in the U.S.
How is permitting different in city limits?
Find your local permit office and confirm which office handles building permits and which handles zoning for your address.
The city is going to want more information, and it will be more involved in the building process. That's the main difference.
It's more paperwork, not a wall. As long as you're zoned for it, you have the proper setbacks, and you're not in an HOA, you won't have any problems.
Will the city treat a steel building as "atypical"?
That isn't something we've run into. We've never had a building department treat our steel buildings that way.
The reason is the paperwork. These are engineered buildings with drawings stamped by an engineer. That's what a building department wants to see.
What does the city need from you?
Plan on handing the permit office:
- A site plan you create, showing where the building sits on the property and how far it is from property lines and other buildings.
- The contractor's insurance information.
- The engineered stamped drawings.

Who handles which part of the permit?
We handle installing the building, and we give you all the information you need to get your permit. You pull the permit yourself.
You're the property owner, the city is your city, and you're the right person at the counter. We make sure you walk in with everything they'll ask for.
What limits catch city customers off guard?
It's usually a peak height requirement. Your leg height and roof pitch together set how tall your building is at the peak, so find out your limit before you fall in love with a tall building.
The other big mistake is size. People don't check zoning, easements and property lines, then try to put a building that's too big on their lot. The city says no. Do that homework first, then design to fit.

Should you try to skip the permit?
No. People always think they can get away without permits, but if the city's there, it will require one. Our advice is always the same: go talk to the city.
The same goes for what you add later. A mistake we see is customers coming back afterward, not telling the inspectors, and putting in an electrical panel or running wiring. In city limits especially, that's asking for trouble.
How do you keep a city project on schedule?
Once your design is final, order the building. That gets you the structural drawings, so you can get the permit and pour the concrete. Lead time doesn't start until site prep and the permit are ready, so the city's review time is part of your schedule. Start early.
The bottom line
City permits take more paperwork, not more drama. Confirm zoning, setbacks, HOA status and the peak height limit, bring a site plan and stamped drawings, and a steel garage inside city limits is very doable.
The full guideSite Prep, Concrete Slab, and Permitting HandbookHow thick a metal building slab should be, whether you need a permit for a metal garage, and how to prepare the site so an installed steel building can go up on schedule.Ready to plan your building?
Tell us what you're building. Quotes within 24 hours.