Do You Need an Engineer for a Garage/Workshop Permit?

Do you need an engineer for a garage permit? Our steel buildings come with engineer-stamped drawings. Here's when you need site-specific ones, and what else.

By Hightower Steel

Building drawings, a white hard hat and a thermos on a truck tailgate, with a steel frame on a slab in a fenced backyard behind

Part of the Site Prep, Concrete Slab, and Permitting Handbook

Quick answers

Why can't you just submit your own plans?
Because engineered drawings are stamped by an engineer, whether they're generic drawings or site-specific ones. A homeowner can only ever give a design recommendation. More
What's the difference between generic and site-specific drawings?
  • Generic engineered drawings are the manufacturer's standard stamped drawings for the building, with the option to increase the snow load. For most projects, they're what you take to the permit office and what your concrete crew follows.
More
What happens when you need site-specific drawings?
Once your order is accepted, your quote is your price. Site-specific drawings are the exception, because they can change the materials. More
What else does the permit office want?
Check with the permit office for your property before preparing the application. Confirm which drawings and documents it requires. More

Usually you need engineer-stamped drawings, and with our steel buildings you already have them. The manufacturers provide engineered drawings that are stamped by an engineer. When your site's snow or wind load is higher than the manufacturer's standard drawings cover, an engineer designs site-specific drawings for your building. A homeowner's own plans are only ever a design recommendation; a permit office wants the engineer's stamp.

A builder on r/DIY designed an entire workshop before applying, then learned he'd have to pay an engineer to redo the design. That's a painful way to find out. Here's how it works with an engineered steel building.

Why can't you just submit your own plans?

Because engineered drawings are stamped by an engineer, whether they're generic drawings or site-specific ones. A homeowner can only ever give a design recommendation. That's the gap the DIY poster ran into: great ideas, no stamp.

With a steel building from us, you don't start from a blank page. The manufacturer's engineered, stamped drawings come with the building.

Steel building interior looking up at the trusses and roof panels

What's the difference between generic and site-specific drawings?

  • Generic engineered drawings are the manufacturer's standard stamped drawings for the building, with the option to increase the snow load. For most projects, they're what you take to the permit office and what your concrete crew follows.
  • Site-specific drawings come in when your snow load or wind load is higher than the manufacturer can provide. Then an engineer designs a building that meets your loads.

We find your loads with the ASCE hazard tool and your ZIP code, so we know early which kind you'll need.

What happens when you need site-specific drawings?

Once your order is accepted, your quote is your price. Site-specific drawings are the exception, because they can change the materials. Here's one real case. We knew a customer would need site-specific drawings and told them ahead of time. When the drawings came back, we told the customer they'd likely need to pay for more materials, and they did.

Nobody was surprised, because we raised it before the order, not after. That's the difference between an engineering requirement that's an annoyance and one that blows up your budget.

What else does the permit office want?

Check with the permit office for your property before preparing the application. Confirm which drawings and documents it requires.

For a steel building, plan on handing over:

  • A site plan you create, showing where the building sits on the property and how far it is from the property lines and other buildings.
  • The contractor's insurance information.
  • The engineered stamped drawings.

We handle the installation and give you all the information you need for the permit. You pull the permit yourself.

What's the most common permit mistake?

Not checking zoning, easements and property lines, then trying to put a building that's too big on the property. The city says no.

Do that homework before you pick a size. On raw land, also confirm your township allows an outbuilding before there's a house. Some states and townships require the house first.

When should you start the engineering conversation?

At the very beginning. Once your design is final, order the building. That gets you the structural drawings so you can go get the permit and get concrete poured. Keep in mind your order has to be completely finalized when site photos go in. Up to that point, changes can be made.

Lead time doesn't start until site prep and the permit are ready, so the sooner the drawings are in hand, the sooner your building is on the schedule.

The bottom line

You do need an engineer's stamp, but with an engineered steel building you don't need to hire an engineer to start from scratch. Get your loads, get the stamped drawings, add your site plan, and your permit application is mostly done.