How big and thick should a metal garage slab be? Follow the engineered drawings, go 1.5 inches bigger all around, and meet the anchor spec. Here's why.

Part of the Site Prep, Concrete Slab, and Permitting Handbook
Quick answers
- Should the slab be bigger than the building?
- Slightly. Follow exactly what's on the generic engineered drawings you're given, because that's what the building requires. More
- How thick does the slab need to be?
- Thick enough to meet the engineered spec where the anchors go. The anchors are 8 inches long and need at least a 12x12-inch concrete perimeter, or whatever the engineer's drawings specify. More
- What slab mistakes cause problems at install?
- The big one: not going thick enough, which means not following the engineered drawings the customer was given. We see it more than anything else. More
- Who drills the anchors?
- We do. Our crew drills the anchors at install, so you don't have to. More
For a steel garage, your slab should match the building's engineered drawings exactly. Generally that means about 1.5 inches bigger than the building all the way around, thick enough for the anchors, which are 8 inches long and need at least a 12x12-inch concrete perimeter, or whatever the engineer's drawings specify. Pouring too thin is the slab mistake we see most often at install. On cost, slabs average about $12 to $14 a square foot including excavation, concrete and cleanup, and $18 to $20 in some states.
A homeowner on r/HomeImprovement asked whether the slab should match the building or be "wider and larger" than the structure. Here's the answer for a steel building.
Should the slab be bigger than the building?
Slightly. Follow exactly what's on the generic engineered drawings you're given, because that's what the building requires. Generally the customer needs to go 1.5 inches bigger all the way around the building.
Don't improvise the size. The frame has to land on the slab where the drawings say it will.
How thick does the slab need to be?
Thick enough to meet the engineered spec where the anchors go. The anchors are 8 inches long and need at least a 12x12-inch concrete perimeter, or whatever the engineer's drawings specify.
Some dealers make arrangements with manufacturers to work around this. That doesn't change the fact that the anchor rating only applies if the concrete meets spec. If the concrete is short, the rating doesn't hold.

What slab mistakes cause problems at install?
The big one: not going thick enough, which means not following the engineered drawings the customer was given. We see it more than anything else.
A close second is an existing pad that was never meant for a building. Sometimes someone has poured a 30-by-25 pad just for vehicles to sit on. Check how thick it is before you put a building on it.

Who drills the anchors?
We do. Our crew drills the anchors at install, so you don't have to. Your job, and your concrete crew's job, is to pour a slab that matches the drawings so the anchors have something to hold.
Who pours the slab?
You hire your own concrete crew; all of our customers do. Hand the crew the engineered drawings and ask them to follow them exactly. That's how the frame fits and the anchors hold.
Budget for it early. Concrete is the cost that surprises customers most. On average we see about $12 to $14 a square foot including excavation, concrete and cleanup, and $18 to $20 a square foot in some states.
Do you need to go below the frost line?
We give you the building's minimum requirements. Then you also have to follow local ordinances, and sometimes the city wants the foundation below the frost line.
Check with your local permit office about foundation requirements and inspections before the pour.
Generally, if you can mitigate frost, you can avoid going deeper. That usually means using rigid insulation to create a frost barrier. Raise it with your building office when you pull the permit.
When should you pour?
After you have your drawings. Once your design is final, order the building to get the structural drawings, pull your permit, then pour. Lead time doesn't start until site prep and the permit are ready. One customer who did it in that order was ready two weeks after their deposit, and their building showed up shortly after.
Lock your design before pouring. Your order has to be finalized when site photos go in, and a slab poured for a different size won't fit.
The bottom line
Follow the engineered drawings to the inch, make the slab about 1.5 inches bigger all the way around, and pour it thick enough for the anchors. Get those right and install day is easy.
The full guideSite Prep, Concrete Slab, and Permitting HandbookHow thick a metal building slab should be, whether you need a permit for a metal garage, and how to prepare the site so an installed steel building can go up on schedule.Ready to plan your building?
Tell us what you're building. Quotes within 24 hours.