Why Do Metal Building Installs Take So Long? What to Ask Before You Sign

Lead time does not start until your permit is in and your concrete is poured. It is an estimate, it can change during the year, and this is not Amazon.

By Hightower Steel

Newly closed-in charcoal steel garage with copper trim, two white roll-up doors, ladders against the wall and an empty flatbed trailer nearby

Part of the Factory-Installed vs. DIY Kits

Quick answers

Why Do Slow Installs Show Up So Often in Reviews?
Because the salesperson did not inform the customer that the lead time does not start until the customer is ready for the building, and they also gave too short of a lead time. The customer likely did not understand that lead time changes throughout the year. More
What Actually Drives How Long a Project Takes?
A lot of it sits with the customer, because site prep and the permit have to be ready before lead time starts. The rest sits with scheduling across a wide territory. More
What Should You Be Told Before You Sign?
A customer should not need to ask a special list of questions. The salesperson should inform them of when the lead time begins, that the lead time is an estimate, that it requires them to be ready, and that it could change or grow throughout the year. More
What Can You Do to Keep Your Own Project From Stalling?
Get the building ordered as soon as you finalize the design. That way you can get the structural drawings, go get the permit, and get the concrete poured. More

Lead time does not start until you are ready for the building, meaning the concrete is poured and the permit is in. It is an estimate, it changes throughout the year, and it can grow. Manufacturers sometimes cover 10 different states, so weather and other jobs in another state can delay your crew. This is not Amazon. A salesperson should tell you all of that before you sign, and our office staff follow up with the manufacturer and then keep you informed.

That is why so many reviews complain about how long a metal building took. The building itself is not usually the problem. The timeline was never explained, or it was explained as if it were a guaranteed shipping date.

Why Do Slow Installs Show Up So Often in Reviews?

Because the salesperson did not inform the customer that the lead time does not start until the customer is ready for the building, and they also gave too short of a lead time. The customer likely did not understand that lead time changes throughout the year.

If a person buys a building in June and is not ready until October, how can the same lead time apply? It cannot. The clock does not start at the deposit if the slab is not poured and the permit is not in. Customers are generally pretty ignorant of the process of how they get their building, and they are too used to dealing with Amazon.

Lead times also change throughout the year on the manufacturer side. For the most part, the estimated lead time given to the customer, if it is given honestly, should give them the buffer they need for an accurate schedule. The problems start when the estimate is too short, or when nobody says what has to be true before the estimate means anything.

What Actually Drives How Long a Project Takes?

A lot of it sits with the customer, because site prep and the permit have to be ready before lead time starts. The rest sits with scheduling across a wide territory.

These manufacturers cover, sometimes, 10 different states. If the customer is in Michigan and the crew is in Kentucky, and it is raining in Kentucky, they are not going to leave Kentucky until that building is done. That creates a domino effect when it comes to scheduling. Your job is in line with other jobs, in other states, in other weather.

That is not an excuse. It is the process. An honest estimate already has buffer in it for this kind of thing. A short, confident date that ignores the permit, the slab, the season, and the crew's other jobs is how reviews get written.

Steel building components staged on a finished concrete slab

What Should You Be Told Before You Sign?

A customer should not need to ask a special list of questions. The salesperson should inform them of when the lead time begins, that the lead time is an estimate, that it requires them to be ready, and that it could change or grow throughout the year.

If a dealer cannot say those things clearly, you do not have a timeline. You have a hopeful date. We would rather tell you the truth about the estimate than promise a day we cannot stand behind.

While you wait, our office staff follow up with the manufacturer and then inform the customer. You should not have to chase a status update that never comes. Follow-up is part of the job.

What Can You Do to Keep Your Own Project From Stalling?

Get the building ordered as soon as you finalize the design. That way you can get the structural drawings, go get the permit, and get the concrete poured. Those are the items that have to be done before lead time starts, and they are the items that most often sit in the customer's court.

Finalize the design, order the building, use the drawings to get the permit and the slab done, and be ready. Do not assume the deposit alone put you in line for a crew. Readiness is what starts the clock.

If you are comparing dealers and the reviews you are reading are about long waits, ask when lead time actually starts, and listen to whether the answer is an estimate or a guarantee. Tell us your design and your timeline. We will tell you when the clock starts and keep you informed after you order.